Blackthorn Solar Farm: what is proposed for our area?

Submission window closes on .

Blackthorn Solar Farm Limited has applied to build a solar farm on approximately 93 hectares in two land parcels near Lackagh and Knockdoe.

The place

Where is the proposal?

See the two proposed land parcels near Lackagh and Knockdoe, covering approximately 93 hectares in total. The northern parcel adjoins the local walking trail. Lackagh village lies to the northeast. Select the map to open the full-size Council drawing.

Open the original Council drawing (PDF)
Northern parcelSouthern parcelWalking trailLackagh village ↗

A closer view of the applicant’s two parcels. Labels have been added to help you find your bearings; the red boundaries are from the Council drawing. Select the map to see the complete original sheet.

The walking trail runs beside the northern parcel. See the published walking-trail map (PDF).

Red outline: subject lands. Blue outline: lands under control. Black crosses: site notice locations. Dotted rectangles: the areas covered by the two detailed sheets.

Original drawing (PDF) · Checked 25 September 2026
Drawing: HW Planning. Base mapping © Tailte Éireann – Surveying, CYAL50521354.

The application at a glance

What would change locally?

The proposal would change how land near Lackagh and Knockdoe is used. Here are three parts to understand before making your views known.

Changes to the local landscape

Solar panels, fencing and electrical equipment are proposed across two land parcels. The overall development area is approximately 93 hectares. Check the boundary and proposed planting to understand where changes could be visible from nearby homes and roads.

See the site map ↗

Construction and local roads

Building the solar farm would involve construction activity, deliveries and site access. If you use the surrounding roads, check the proposed entrances and construction arrangements, and explain any relevant local experience in your submission.

Read the Planning Statement ↗

A separate proposed substation

The applicant places a proposed 110 kV substation in the field immediately north of the Claregalway GAA walking trail at Knockdoebeg West. It says this part of the wider project requires a separate planning application.

See the submitted assessment ↗ · Read the Planning Statement ↗
The application explained

Frequently asked questions

How much land is shown on the map?

The applicant describes an overall development area of approximately 93 hectares across two land parcels. The red outlines show the subject lands. The 93 hectares does not mean every part would be covered by panels.

What is included besides solar panels?

The solar farm application includes associated electrical equipment, access tracks, fencing and cabling. The Planning Statement describes the proposal.

Would there be a substation as well as solar panels?

The applicant proposes a 110 kV substation and grid connection as part of the wider Blackthorn project. It describes them as necessary to connect the solar farm to the national electricity network. See the Planning Statement, section 1.2.

Where would the substation be?

The applicant’s Landscape and Visual Impact Assessment places it in the field immediately north of the Claregalway GAA walking trail at Knockdoebeg West. See the submitted assessment, page 35.

Would this application approve the substation too?

No. The solar farm application is before Galway County Council. The applicant says the substation and grid connection require a separate application to An Coimisiún Pleanála.

How can I have my say on the solar farm?

The Council currently lists 20 October 2026 as the closing date for submissions on application 26/61567. A formal submission goes directly to the Council. Follow the submission guide for the times, fee and steps.

Submission deadline

Send your submission by 20 October 2026

Online submissions close at 11:59 p.m. Email, post and in-person submissions must arrive by 4 p.m. All times are Ireland time.

How to send your submission

Your community

Why does it matter to you?

The proposed parcels sit near local homes and roads, and the wider project places a substation beside the Claregalway GAA walking trail. If you live nearby, travel these roads or use the trail, your knowledge of the area can help the Council understand how the proposal relates to everyday life here.

See the proposal in detail
Three clear steps

How do you have your say?

  1. Check the plans

    See the proposed location, scale and official application documents.

    Read what’s proposed ↗
  2. Write your views

    Use the simple outline to explain what matters to you, in your own words.

    Use the submission outline ↗
  3. Send them to the Council

    Follow the guide for the deadline, fee and official submission route.

    Follow the submission guide ↗
From the group

Updates & meetings

All updates ↗
27 September 2026 at 12:30 · Lackagh Parish Centre

Information Drop-in

Come along to learn more about the proposed Blackthorn Solar Farm near Lackagh and Knockdoe.

Find your next step

Join the group or lend a hand

You can help neighbours find the plans, share meeting details or offer time and local knowledge. Get in touch to join the group or volunteer, or meet us at a published Information Drop-in.